Please be advised that there’s a final aquatic herbicide treatment for Lake Leprechaun on September 11th,
followed by a 3rd session for Lake Limerick on September 12th.
This treatment is essential to maintain the health and balance of the ecosystems of both lakes.
![](https://lakelimerick.com/wp-content/uploads/2023/09/Lake-Limerick-Country-Club-Logo-New-Transparency-300x236.png)